2-AXLE ALUMINIUM TANK SEMITRAILER IN BOX BODY DESIGN
With pumping and measuring system, for airfield operation and road transport
Vehicle designation acc. to 9.1.1.2 ADR: FL
Tank code acc. to 4.3.4.1 ADR: LGBF
Special provisions acc. to 6.8.4 ADR: TE 7, TE 19
For transporting JET A-1
Swivel rocker with cable bushing on fifth-wheel coupling
Stainless steel chassis frame
Single wheel plastic mudguards with mud flaps and spray-suppression system Side impact protection, foldable Aluminium underride protection
Axles Air suspension unit with low-maintenance axles and disc brakes,
2 x 10 t rigid, wheelbase 2,050 mm
Suspension
Air suspension
Tyres
4 x 425/65 R 22.5, 165 K, manufacturer as per factory specifications 4 aluminium wheels, 11.75 x 22.5, polished outside, 10-hole,
without rim offset
Brake system according to EC Directive 71/320 or ECE R13
Two-line brake
EBS-E = electronic brake system
WABCO 2S/2M = one axle sensed
RSS – stability program
Spring-loaded parking brake on 2 axles
Aluminium air tank
Aluminium alloy and wall thickness as per ADR regulations
Double-wedge box format for complete drainage Gross capacity: approx. 34,000 l
1 chamber
Baffles, if techn. required
Water sump
Overflow pan incl. outlet pipe(s)
Protection for dome fittings
Aluminium catwalk in pan with foldable railing Aluminium ladder at rear
3 dome covers with rapid-fill lids
1 fill level indicator, 10″
1 pneum. level switch for fill level monitoring
1 pneum. level switch for low-level limiter 3 pneum. tip valves
3 fan pots with flame arresters
1 mech. dipstick
Filling 1 pneum. bottom valve with filling line and industrial dry couplings
Output
2 pneum. bottom valves for output DN 100
Underwing pressure fuelling via long hose, underwing pressure fuelling via two deck hoses
Refilling via deck hoses
Overwing fuelling
Aluminium piping routed to the front – through the swivel rocker – to the fittings cabinet on the STT
Gas return line connected to fan pots
Safety pressure relief/vacuum valve
– Pump pressure
– Venturi pressure
– Hydraulic pressure
– Flow chart
– Pressure gauge for aluminium air tank
– Pump suction/-pressure gauge
– Sample extraction from piping
1 external cable drum with automatic winding mechanism
2 x 6 kg fire extinguishers
2 warning triangles
1 hazard warning flasher with work light and batteries
1 plastic collecting vessel
1 dustpan, galvanised
1 hand brush
1 PVC box with oil binding agent
1 high-visibility vest
1 pair of protective goggles
1 pair of gloves
1 eyewash bottle
1 drain cover
1 single substance plate (30/1223)
3 removable hazardous substance labels (flame symbol)
3 removable hazardous substance labels (environmentally hazardous substances)
Rear markings as per ECE standards
2 seven-chamber tail lights in underride protection
LED side marker lights
2 clearance lamps at front
2 contour lights on underride protection
15-pin socket
2 ex-proof fittings cabinet lights
2 red airfield warning lights
Priming and spray painting with 2-component acrylic paint for commercial vehicles (standard RAL or truck colour)
Chassis with attachments and transport containers unicoloured as per colour specifications
Plastic components unpainted
Powder-coated attachments/installation parts black
Contour markings
Continuous reflective stripe on left and right, white, in tank length
All-round at rear, segmented, red
Acceptance as per ADR
Tank documentation
Refuelling platform with steps on left in direction of travel
Fittings cabinet with fold-up doors on both sides
Pump unit on right in direction of travel
Substructure for swivel rocker on fifth-wheel coupling
1 self-priming tandem pump with hydraulic drive
1 filter water separator with attached
gas separator
Filter equipment:
1 piston-type differential pressure gauge
1 gas return line to tank
1 check valve after filter
Drainage line with 2 shut-off cocks R 3/4″ and dummy caps
1 flow meter, with electron. meter
Parallel display on refuelling platform
Label printer in cab
1 sight glass
1 automatic valve for inline pressure control
Pressure relief for the piping system
2 venturi nozzles
Contact your preferred office and we will do our best to solve all your challenges
Get intouch